Skip to content
yardro
ProductPricingCompanyContact
Log inStart free trial
yardro
ProductPricingCompanyContact
Log inStart free trial
  1. Home
  2. Product

From the first walk-through to the final invoice.

Five jobs the software does, in the order your jobs actually happen. Everything feeds everything else, so you enter it once.

HIGH DESERT LANDSCAPES
Sales
Leads
Estimates
Clients
Production
Schedule
Jobs
Payroll
Money
Invoices
Contracts
Payments
Reports
Profit Advisor
Setup
Templates
Price Catalog
Crew
Settings
EST-0142 · Hillcrest patio and seat wallSentSample job · illustrative data
Internal, not shown to client
KindDescriptionLine TotalUnit CostLine CostMargin
MaterialPaver patio (per sq ft)420 sq ft × $22.00$9,240$14.20$5,96435.5%
LaborPatio install labor64 hr × $68.00$4,352$56.00$3,58417.6%
MaterialSeat wall, 18 lf18 lf × $165.00$2,970$113.11$2,03631.4%
LaborSeat wall labor36 hr × $51.06$1,838$56.00$2,016−9.7%
Subtotal$18,400
Total$18,400
Deposit due (50%)$9,200
Internal, not shown to client
Est. total cost$13,600
Projected gross profit$4,800 · 26.1%
Template
Paver patio (per sq ft)
How many sq ft?
420
Add 2 Lines

Sample estimate EST-0142, Hillcrest patio and seat wall: 4 priced line items totalling $18,400 with a $9,200 deposit due on acceptance. The internal columns, hidden from the client, show an estimated cost of $13,600 and a projected gross profit of $4,800, 26.1 percent.

Estimating

Price it from your book, not a national average.

  • A price book of your materials, your labor rates, your markups. The numbers your market actually bears.
  • Assemblies price whole scopes in one pick: paver patio, seat wall, low-voltage lighting run.
  • Once the AI estimator is connected, describe a job in plain words and it drafts the estimate from your own catalog and templates. Anything it can't match is flagged for you to price.
  • The estimate becomes the job budget, so the number you bid is the number the job answers to.
Start free trial
9:41
Client portal on a phone, sample data: the small company wordmark with a call button, “Hello, Alan & Priya.”, then a proposal ready to sign for $7,592.00 with a Review & sign button and a $9,000.00 progress invoice with a Pay now button, above Message us, Your project and Invoices & receipts.
Sample data

Winning the job

Signed on their phone, deposit invoice on the spot.

  • A private client portal where the proposal reads like a document, not a spreadsheet.
  • E-sign at their kitchen table, on their phone. No printing, no scanning, no chasing.
  • The deposit invoice is created the moment they sign. Once you connect Stripe, they can pay it by card.
  • Sending a proposal moves the lead to Proposal Sent, and a client signing online moves it to Won.
See pricing
Foreman reviewing the schedule on a tablet at the jobsite
Paver patio · Crew schedule
9:41
Crew app on a phone, sample data: “Hey Cole”, an On the clock card showing 3h 42m on the Full Backyard Redesign job with a Clock out button; below it the job card with the site address, a Directions button, the foreman, and Site photo and Call office buttons, above the My Day, History and Settings tabs.
Sample data

Running the build

The schedule, the crew, and the weather in one view.

  • The crew schedule sits next to the forecast for each jobsite, so rain risk on pour day shows up Monday, not Thursday morning.
  • Crews clock in from the truck, on the job they're standing on. Hours land on the job the same day.
  • Change orders get priced and approved before the extra work starts, and the handshake becomes a line item.
  • The crew side is deliberately small: clock in, clock out, today's jobs, a site photo. If they can text, they can run it.
Start free trial
Jobs · JOB-0142Sample job · illustrative data
JOB-0142 · Hillcrest patio and seat wall
In progress
Revised Contract
$19,650
$18,400 base + $1,250 in COs
True Cost to Date
$14,824
$5,824 labor incl. burden + $9,000 expenses
Gross profit to date
$4,826
24.6% gross margin on revised contract
Invoiced / Paid
$19.7k / $19.7k
$0 outstanding
Budget vs. Actual
Labor (incl. burden)$5,824 of $5,950 · 98% used
Materials & Other Costs$9,000 of $8,500 · 106% used
Green under 85% of budget · amber 85–100% · red over budget
Labor Log
DateCrew MemberHoursCost RateBurdened Cost
Aug 18Foreman8.0$34.00/hr$448.00
Aug 18Laborer8.0$34.00/hr$448.00
Aug 19Foreman8.0$34.00/hr$448.00

Sample job cockpit JOB-0142, Hillcrest patio and seat wall, in progress: revised contract $19,650, true cost to date $14,824, gross profit to date $4,826 at 24.6 percent, invoiced and paid in full. Labor is at 98 percent of its budget and materials and other costs at 106 percent.

Knowing your money

Margin you can trust before the final invoice.

  • Burdened labor costing: what an hour really costs you, with wages, taxes, comp, and overhead built in.
  • When the crew clocks out, those hours are already costed on the job with your labor burden. Nobody retypes a timesheet.
  • Payroll-ready hours export and reports your accountant can live with.
  • Your home board marks every job in progress Steady, Watch, Slipping or Over budget, and says why in one plain sentence.
Start free trial
Backyard putting green surrounded by fresh planting
Synthetic turf putting green · Planting beds

Keeping it growing

The steady work stays steady.

  • Maintenance contracts draft their monthly or quarterly invoices on their own, and you send the batch in one tap.
  • Every estimate and invoice you email lands on that client's timeline by itself.
  • Seven exports for your accountant: invoices, payments, clients, job costing, price book, weekly payroll and payroll by job.
Start free trial

From the first call to the last report.

Every step works off the same numbers. The estimate becomes the budget, the crew's hours land on it, and the invoices come off it. Your client follows their side in the portal.

One set of numbers

Every step reads from and adds to the same job.

  • Price book
  • Contract
  • Budget
  • Hours
  • Cost
  • Invoiced
  • Paid
  • Profit

The job, step by step

  1. Lead

    The first call, logged once

    A new lead is logged once, and its estimate starts from it.

  2. Estimate

    Your price book and assemblies

    Priced from your own price book and assemblies, with production rates in hours per unit. Cost and margin stay on your side.

  3. Proposal

    E-signed by the client

    The client reads it and e-signs through a private link or their portal.

  4. Deposit invoice

    Issued when they sign

    Signing issues the deposit invoice automatically.

  5. Job budget

    Dollars and field hours

    The signed estimate becomes the job's budget, in dollars and field hours.

  6. Schedule

    Visits, with rain risk flagged

    Visits go on a schedule that flags rain risk. The client can confirm a visit, or ask for another day, from the portal.

  7. Crew clock

    By job, on their phones

    Crews clock in and out by job on their phones. Drive, load and shop time stay apart from site hours.

  8. Job costing

    Burdened labor, at clock-out

    When the crew clocks out, their hours land against the budget at your burdened labor rate.

  9. Change orders

    Priced and approved on the job

    Extras are priced and approved on the job. Approval raises the contract and the budget together.

  10. Invoices

    What's left to bill

    A draft invoice shows what's left to bill on the contract and adds it in one tap.

  11. Payments

    Recorded on each invoice

    The office records each payment against its invoice.

  12. Reports

    Payroll hours, job profit

    Hours export payroll-ready, and the job profit report leaves sales tax out.

Your client’s portal

Their side of the same job, the whole way round.

  • Signs, and gets the deposit invoice
  • Confirms visits, or asks for another day
  • Sees the photos you share
  • Invoices, receipts, statement
  • Messages
  • Documents

Maintenance contracts

Recurring work bills from one contract. Each period’s invoice is drafted for you.

Every line of work, on one set of books.

Each trade prices in its own unit and runs at its own production rate. Here is how the one price book, crew clock and client portal handle each of them.

  • A hand-drawn landscape plan with planting beds, a lawn and a boulder feature on a wooden workbench, beside work gloves, a pencil, a tape measure and a mug of coffee

    Landscape

    Landscape design

    Price the design fee flat or by the hour from your price book. The client e-signs through a private link, which issues the deposit invoice automatically, and you share the plan in their portal.

  • Gloved hands setting a concrete paver onto sand bedding along a string line at a patio install

    Hardscape

    Pavers and patios

    Build the patio from an assembly: base, bedding, pavers and labor at your own production rate per square foot. The client sees each line and its price. Cost and margin stay on your side of the screen.

  • A foreman checks a tablet at a front-yard install while two crew members move soil with a wheelbarrow behind a new boulder wall

    Landscape

    Full landscape installs

    Crews clock in and out by job on their phones, with drive, load and shop time kept apart from site hours. You choose which progress photos the client sees in their portal, and hours export payroll-ready.

  • Aerial view at dusk of terraced boulder retaining walls stepping down a slope, with a lit paver path, steps and a round paver patio beside a lawn

    Hardscape

    Retaining walls

    Price walls by the square foot of face, with drainage rock and fabric on the same estimate. Once it is a job, crew hours land against the budget the day they are clocked.

  • A backyard synthetic putting green with a flag and cup, edged in curved pavers and framed by ornamental grasses

    Landscape

    Synthetic turf and putting greens

    Turf and base prep price by the square foot. The schedule flags rain risk on install day, and the client confirms the visit, or asks for another day, from their portal.

  • Close-up of a dry-laid stone wall of grey and rust-colored blocks with moss in the joints

    Hardscape

    Natural stone and masonry

    Stone sets slower than block. Give each stone assembly its own production rate so the bid carries the hours your masons really take, then watch burdened labor against it on the job.

  • A flagstone patio at dusk with lights glowing under the cap of a curved stone seat wall, and a pergola over an outdoor dining area

    Lighting

    Low-voltage lighting

    Fixtures priced each and wire by the linear foot, straight from your price book. Save your usual lighting package as an assembly and drop it onto any patio or wall estimate.

  • An outdoor kitchen with a stone-clad island, a built-in grill and a sink under a cedar pergola strung with lights at dusk

    Hardscape

    Outdoor kitchens and pergolas

    Kitchens and pergolas change mid-build. Price the change order on the job and mark it approved when the client agrees, before the extra work starts. Approval raises the contract and the budget together.

Maintenance runs on the same books. Set up the contract once, and each period’s invoice is drafted for you.

Illustrative photos

See your own numbers in it.

A person activates your Yardro within one business day.

Start free trial

14 days free from go-live · Card required, $0 today · Cancel anytime

Site links and contact

yardro
ProductPricingCompanyContactLog inPrivacyTerms
hello@yardro.com

© 2026 Yardro LLC. Photography is illustrative.